Talisman was selected to perform the restoration of the historic Civic Center in downtown Great Falls, Montana. The project required the installation of scaffold systems to access the upper auditorium, fly loft and East Entry areas for the cleaning, removal and reinstallation of the existing cast stone façade. Upon completion of the work Talisman’s personnel will have removed and replaced approximately 2,000 individual cast stone panels and details at all elevations of the building over a two-year period. Talisman’s precast division provided all of the reproduction elements. As part of the contract the entire roof system will be replaced along with concrete stairs
Share this post