Troy Hall – WSU

Selective Demolition Phase Talisman was selected by Lydig Construction to perform the selective demolition scope of work for the renovation of Troy Hall on the campus of WSU.  Talisman completely stripped the interior of the four-story structure and selectively removed all of the concrete structure/floors.  The work required close coordination with various trades to ensure…

Read more

Lower Granite Dam

Talisman was contracted to perform the saw cutting and demolition work associated with the modifications and extension of the existing juvenile fish passage inside of Lower Granite Dam.  The work involved multiple phases and mobilizations and included the installation of temporary work platforms at the drainage gallery shaft and at the South Non-Overflow area.  Talisman…

Read more